DESIGNED FOR DURABILITY AND SAFETY IN HARSH TRADE ENVIRONMENTS

new_1.jpg

INT   +64 9 431 1055

NZ     0800 394 222

AUS  1800 001 264

Products
doc_top_img.jpg

Pedestrian Access

      karapiro dam.jpg
KARAPIRO DAM - MIGHTY RIVER POWER
Light enough to fully assembly then place in position easily
      kaiparamangawhai.jpg
KAIPARA WESTMOUNT SCHOOL
This stair come out approx $5000 less cost than steel. Easily installed by the builder, without a crane. Totally rigid to walk on.
MANGAWHAI BEACH ACCESS - KAIPARA DISTRICT COUNCIL
Approx cost to manufacture and install $25,000. Non rust durability in harsh marine environment. Covered in sand and enjoying it.
      arapuniqueen.jpg
ARAPUNI DAM - MIGHTY RIVER POWER
Easily carried through bush by hand and bolted down fast. Installed by one person.
UPPER QUEEN STREET - AUCKLAND, TITCHENER GROUP
Gleaming good looks that add value to any building. Completed off site and installed with no fuss, no disturbance of tenants.
prefooter_top_img.jpg